Tests and inspections
Among some of the facilities or systems we provide test and start-up services include:
CHECKS OF PROTECTION SYSTEMS
• Test and calibrate all types of protection relays
• Plant expansions and insertion of new protection relays
• Supply and verification of CT's and VT's
POWER TRANSFORMER ANALYSIS
• Transformer Inspections
• Transformer Testing/Analysis & Repair
• Check Buccholz oil level alarm circuits
• Winding ratio and resistance measurements
• Oil Analysis
CABLE INSULATION TESTS
• Test of new cables after laying;
• Test of disconnected cables;
• Periodic testing of cables;
• Application of splices on cable line sections.
• Insulation measurements up to 80 kV.
PARTIAL DISCHARGE ANALSYS
The IEC 60270 standard defines partial discharges as "local electrical discharges that only partially exceed the insulation between conductors".Partial discharges are difficult to detect in the field and can be extremely destructive if not detected.
The company has the most recent tools for the research of partial discharges on medium and high voltage assets by ultrasonic measurement. Measurement a is based on the emission of sound waves by the partial discharge.The frequency bandwidth of the emissions tends to concentrate around 40 kHz but extends to the audible frequencies in the event of extremely pronounced discharges.This analysis is carried out during normal operation of the plant, without the need for safety measures or plant shutdowns.
SURGE ARRESTER
• Periodic tests for checking and diagnostics on metal oxide on surge arresters.
• The checks are carried out according to the IEC 60099-5 standard.
• Analysis of the third harmonic current with compensation.
TESTING OF SF6 GAS INSULATED SWITCHGEARS PANELS
The company has all the necessary equipment for:
• SF6 gas recovery on existing switchboards
• Filling with SF6 gas on SWB's
• Search for leaks SF6
All our technicians have specific European certification in the FGAS register to operate on components with Sulfur Hexafluoride (SF6)